• Are you asking yourself exactly how to fit a kitchen? The expense of generating a specialist to fit a brand-new kitchen area could run into several hundreds of pounds. Depending upon the quantity of job needed. So, if you are able, it’s an excellent idea to do it yourself.

    In my situation, I replaced all the kitchen cabinets and also worktops, retiled the wall surfaces (how to floor tile a wall surface), installed a brand-new stove and fitted laminate floor covering (how to lay laminate floor covering). It took me a weekend to do the job from start to finish.

    Most proficient DIYers have the capability to do this type of job. If you disappoint all the needed abilities, you can bring in the experts as and when required.

    • Fitting a kitchen– the tools as well as tools you need
    • Pierce motorist (some web pages you might use such as: cordless drills, corded drills as well as a convenient power drill purchasing guide).
    • Timber and also masonry drill little bits.
    • Electricians screwdrivers.
    • Power/pipe detector.
    • Swelling hammer.
    • Strengthen carve.
    • Level.
    • Pliers.
    • Side cutters.
    • Pump pliers.
    • Hand saw.
    • Jigsaw.
    • Measuring tape.
    • Sealant weapon.
    • Square.
    • Marker pens.

    Do not neglect security devices such as safety glasses, encounter masks and gloves. If you are using 240volt power tools make use of an RCD protection device.Always remember safety and security precedes. Check before starting the job where the solutions are in the kitchen area. Make use of a power/pipe detector to check for concealed online cords as well as water/gas pipes prior to eliminating the kitchen units, piercing holes or going after out walls.

    Fitting a cooking area– Strategy the format.

    To  start your brand-new kitchen begin by taking dimensions of the kitchen area. When you have actually completed it is worthwhile checking your measurements to conserve a lot of future troubles.

    These are some points to think about with your design:-.

    • Typically, sinks go under a window.
    • Don’t position sink devices or hobs also close to or on a joint in a worktop.
    • To minimize the amount of plumbing needed, placement cleaning machines as well as dishwashing machines close to the sink.
    • Hobs require room on either side for the frying pan to take care of.
    • Set up any type of extraction device (read: exactly how to mount an extractor follower) on an outside wall.
    • Do not ‘box in’ any gas home appliances as they need excellent air movement for correct operation and also security.
    • Do not position electrical outlets or buttons above hobs for cookers.
    • Ensure your new cooking area is functional as well as easy to use.
    • Wall systems as well as the base systems below them need to coincide width, so doors as well as takes care of alignment.
    • Electric sockets need to go to the very least 150mm from the completed worktop to enable area for the plug top flex. It’s much easier to floor tile if the outlet( s) get on the tile line.
    • Before you accomplish any electric operation in the home check out the structure policies on the Federal government or neighborhood authority site especially the Component P laws and Electric security in the residence. Although I am not knowledgeable about the current policies it is worth reading the latest laws as they have actually been updated in the past.

    Any kind of gas job will need a gas secure registered plumbing technician/ designer. You can check credentials or look for a suitable business below.When you have made a list of the devices needed for the cooking area do not neglect all the additionals such as:.

    • Cornice.
    • Pelmet.
    • Plinth.
    • Edge blog post.
    • Jointing kit with coloured jointing substance.
    • Water waste kit.
    • Attractive clad end panels to match the doors, consisting of perhaps an added one to use for loading any gaps, any type of appliance doors, and so on
    • . Fitting a kitchen area– Preparation.
    • The first step towards your new kitchen is removing the old one. Put on the ideal security devices, handwear covers, safety glasses, etc
    • . How to eliminate old kitchen cabinets and also worktops.
    • Get rid of all the doors, cabinets and also shelves, after that remove any screws that are taking care of the worktop( s) to the base devices. If the worktop sides are under tiles you may need to remove sufficient to ‘liberate’ the worktop. If there’s a worktop glued to a base system, utilize a lump hammer or crowbar to divide them.

    The systems themselves need to be fairly simple to remove and must split up fairly easily. Specifically with one’s trusty lump hammer. If the old cupboards won’t leave quickly, get somebody to help you.Look out for hidden cable televisions and pipes– most people won’t value an interior swimming pool!Place all the old units and also worktops outside as well as out of the way. You’ll need to get rid of them somehow. So you could want to hire an avoidant for a couple of hours if you do not have a van.

    How to remove an old sink device.

    Getting rid of a sink device can be a little challenging. Especially if it’s been in location for a variety of years. The first thing you wish to do is switch off the water system to the cold and hot taps.Look for the seclusion shutoffs. Making use of a screwdriver, transform them one quarter right into a straight placement. Currently turn the taps on to clear the water still in the pipework. Once the water stops running, you can go on and remove all the pipework.

    Normally, little fixing clips connect the cooking area sink to a worktop. Utilize a proper screwdriver to eliminate them. You may locate it simpler to lie on your shoulder when doing this little bit.When you’ve removed the clips, from above, try getting rid of the sink. If you can not do it, run a utility knife around the side of the sink to get rid of the old silicone. It ought to leave without way too much hassle.

    Turning off gas and electrical power supplies in the kitchen.

    If you are detaching any electrical supplies, switch off the consumer system and get rid of the fuse/miniature breaker too. This decreases the possibility of the circuit becoming ‘live’ if you unintentionally turn on the consumer device.Double check the supply is ‘dead’ at the point of disconnection. If unsure make use of the solutions of a qualified electrician as electrical shocks can be fatal. Do not attempt to detach any kind of gas materials. By legislation, just a Gas Safe signed up plumber/engineer can execute this kind of work.

    When you have actually completely removed the old kitchen area, you can begin to deal with obtaining the space all set for the brand-new one. In my instance, I made some fixings to the existing wall surfaces and also floors as well as got rid of the old floor tile adhesive.You might require to set up new electrical sockets, gas pipes or lights.

    Fitting a cooking area– Where to start?

    Your new kitchen units have been supplied and also the kitchen location awaits the mount, yet where do you begin?The very first work to do is inspect the degree of the floor, wherever the acme is measure up 870mm and mark the wall, this dimension enables 720mm for the base unit as well as 150mm for the plinth.

    From your mark attract a level line using your level throughout the wall surface( s), this is the standard for all your base systems. Now measure up from the 870mm mark to the bottom of your wall surface units (this measurement is down to personal choice).I would certainly suggest 400– 440mm. From this mark attract a level line throughout the wall surface( s).

    Lastly, measure up from the mark to the top of the wall surface units i.e. 720mm, as well as once again attract a level line throughout the wall surface( s).Now double check your lines are all degrees.

    Fitting a kitchen area– Set up the units.

    Develop a space to set up the new kitchen cabinets. Some of the system flat-packs can be really heavy, so obtain aid when lifting them. Cover the workspace with the cardboard product packaging to shield the kitchen systems from square one and damage. And maintain all the hinges as well as coloured spaces in a box for later.

    Setting up the very first device utilizing the directions can take a while (read the post on exactly how to construct flat pack furnishings), but once you have a setting up approach the rest will certainly fit quite swiftly. If you are making use of a battery drill/driver without torque control make sure not to over-tighten screws. Often it’s safer to utilize a screwdriver for the last 1 or 2 turns.If your kitchen area remains in a ‘L’ or ‘U’ shape begin fitting the units from the corner exercising in both directions.

    Before taking care of the wall systems I prefer to position the initial base system levelled up as well as in position. After that I mark the wall surface with a vertical line from its side so I have a guide-line for the wall units so they will line up with the base systems.

    Wall units typically come with 2 dealing with braces each. When you have actually put together the wall surface device, action where the taking care of braces needs to be in order for it to ‘hook on’. Transfer the dimensions to your wall as well as repair the braces safely– I generally pierce the dealing with( s) at a somewhat descending angle as this reduces the chance of the repair ‘pulling out’.Usage top quality corrections and when it comes to plasterboard, use dental caries mendings where the brackets don’t land on a wall stud.

    For peace of mind on a plasterboard wall I constantly fit extra angle brackets between the wall surface studs as well as the top of the wall surface device so I recognize I have an excellent deal. They are a little undesirable however they are normally out of sight and can be repainted or papered over– at least you recognize the wall device won’t become a base device overnight!

    Mount each wall surface unit checking them with a level and seeing to it the edges are flush as you go along. They are adjustable through 2 screws inside either top edge of the wall surface system, one screw increases or reduces the unit, the various other draws the system limited versus the repairing bracket as well as locks it ready. At this stage don’t worry about any little voids in between the wall surface unit end and the wall itself.

    As I explained earlier in this article, begin setting up the base devices from the corner (if you have one ). Make sure each system is level prior to moving onto the next one, utilize your 870mm level line as the overview.Fix the devices to the wall surface until they are all in setting as well as you make certain they are all level.

    The majority of flatpack kitchen cabinets come supplied with two male/ women screws to link the devices. These normally call for an opening drilling of around 5mm size with the sides of the devices. When fitted, they hold the units together and maintain the edges purge. Pierce brand-new holes for these bolts, don’t be lured to make use of existing ones as they may be for drawer runners etc

    Fitting a cooking area– Mounting new worktops.

    I am thinking for the objective of this short article that you will certainly be using joint strips between the worktop sides. You can obviously reduce a mitre joint utilizing a router as well as jig yet this is a job where I would certainly use the solutions of an experienced joiner.

    These cuts need to be precise and also the cost, not neglecting the wait for a substitute worktop, has in the past placed me off trying.If you are proficient as well as certain sufficient to reduce a mitre joint, check your router has a collet big sufficient to take a half inch (13mm) router little bit. The ‘bits’ which cut to worktop depth generally, as far as I am aware, have a half inch (13mm) shank, whereas most DIY routers will only take up to an 8mm shank.

    Butt joints (worktops joining edge to edge) are less complicated but have to be cut properly, on the reverse side of the worktop( s). Slots need to be cut-out utilizing a router as well as jig. Securing brackets, which are in these slots, are tightened up from below when the worktop remains in placement on top of the kitchen area units.

    Tinted jointing sealant must be placed onto one side of both areas of the worktop and as you tighten up the clamps inspect continuously just how flush the worktop edges are merely by touch. Take care not to over-tighten the clamps as the completed edge of the worktop may start to ‘lift’. When you are satisfied with the high quality of the joint, clean away the surplus joint sealant with the solvent that should be provided with it.By the way, the coloured sealer is really useful to mask any type of small chips or scrapes that may however take place throughout the fitting of the worktop( s).

    Fitting kitchen area worktops requires support, not only for cutting them to size, yet additionally because of their size and also weight. The last thing you intend to do is to damage one when putting it in addition to the new kitchen area units.If you have a ‘U’ or ‘L’ designed cooking area begin with the centre or ‘back’ worktop.Prior to you cut the worktop to size action along both the back and front edges of your base systems just in case the walls are not quite square and also move these dimensions to your worktop. Double check your dimensions and remember you can allow a couple of millimetres for any end that will have wall ceramic tiles overlapping the worktop edge, after that do the cut.

    You can make use of a timber saw for this task, however a jigsaw makes it easier. Just keep in mind to use safety glasses and also a face mask. If the mask quits seeing your cutting mark on the worktop use concealing tape as well as re-mark the cutting line.When positioning the worktops on the base units you may need to chase after a little plaster along the wall to permit the worktop front edge to line up with the base devices. Preferably, the worktop must extend over the base unit’s front edge by an equivalent amount along its entire size.

    Now determine the various other worktop( s) once again, throughout both the front and also back sides of the base systems as well as cut to dimension enabling the joint strip.Seal the end of the worktop with either pva adhesive or clear sealer before suitable the joint strip to stop any kind of future liquid spillage from damaging the worktop.When you are pleased the worktop( s) are sitting on the base units properly you can define your cuts for the sink system and hob. Once more make use of masking tape if you can not see your definition plainly.

    If you are privileged the sink device as well as hob will come with design templates to mark the worktop for removing. Normally the hole to be cut is around 5– 10mm less than the circumference of the sink unit or the hob. The sink system can be placed face down on the worktop, the circumference can be marked out, after that reduced by the proper measurement all round. The hob might have no design template but should have the cut out measurements provided with it. These measurements need to be marked out extremely precisely and make certain the hob remains in the placement you want it.

    Double check your measurements prior to making any kind of cuts in the worktop (I fitted a hob recently which only had a 5mm side that rested on the worktop so I must have inspected my marking out a minimum of a number of times).These cuts can then be made using a jigsaw. When you have actually finished the cuts as well as the worktop( s) are back ready they can be repaired making use of the screws provided with the base units. Once again seal the cut-outs of the worktops with pva glue or clear sealant prior to fitting the sink unit and also hob.

    Fitting a cooking area– Rounding off.

    Fitting the hob and sink system is fairly simple, both come with clips that hold them down firmly to the worktop. Hobs normally have a thin foam or rubber seal around the side as well as this is sufficient to maintain any fluids out.Only you know whether you are experienced enough to reconnect the hob to the electric supply. I would certainly suggest you make use of a certified electrical expert that will certainly utilize the right dimension/ sort of cable and also connect the hob correctly for secure usage. With gas hobs you ought to utilize a Gas safe registered plumber/engineer to connect the hob to the gas supply.

    Prior to suitable the sink device, if possible fit the tap( s) with two versatile pipes to it, each around 30cm long (which will conserve a great deal of time when reconnecting the pipework) as well as likewise run a grain of clear sealer roughly 6– 8mm thick under the edge of the sink device which need to be more than ample to shut out any kind of liquid.

    Position the sink device in position and tighten up the clips until it is safe. Take care not to over-tighten the clips as they often tend to ping off and also are challenging to refit.Eliminate any kind of excess sealant from the external side of the sink unit. Currently you can fit the waste pipework and surface plumbing in the pipes to the tap.

    • Repairing blocks.
    • Taking care of blocks.
    • Now the plinths can be cut to length as well as fitted.

    They usually connect to the base device legs via plastic clips that are fixed to the reverse side of the plinth. The cornice as well as pelmet can likewise be reduced to length.Utilizing a mitre saw power tool can provide an excellent high quality, tidy cut and also therefore a better finish, especially if any type of tilted cuts are needed. Do not forget the goggles and also the face mask.You may wish to wait prior to cutting the pelmet to length as any kind of tiled wall surface can change its needed length.

    Both the cornice and also pelmet can be fitted to the wall units using fixing blocks with certainly the proper size screws. Wall unit lights can be fitted, yet again you might want to wait up until any tiling has been finished.So finally the cabinets and doors can be fitted. Drawers are fairly simple to construct complying with the guidelines. Affix one door each time to the devices, hinges are usually in two parts, one for the device and also one for the door. Fit the system one( s) first so they prepare to accept the door. Currently fit the other parts to the door.

    • Two part hinge.
    • Two components hinge.
    • Take care of both for the doors and also cabinets might need two fixing openings being drilled.

    There are dimple marks on the opposite of the doors to indicate where to pierce the holes, these holes need to be pierced as straight as possible and with the appropriate dimension drill bit to suit the taking care of screws for the handles.When suitable the doors ensure both parts of the hinge friend together correctly or else it will certainly be hard to readjust the door. As you take a look at the hinge, the screw at the back holds the door in place, the other one allows you to adjust the door later for alignment. When all the doors are fitted they can be adjusted so gaps between them are also and all doors are level.

    When rounding off the new cooking area it’s worth sealing any type of spaces at the back of the worktops with clear sealant so there is much less danger of water damages before the wall( s) are tiled.Any little spaces in between the cooking area systems and also the wall( s) can be filled up utilizing cuts of decorative attired end panel. Doing this gives the kitchen area a much more expert finish.

    As shown in the photo listed below, I partially loaded a space between a washing machine and also a wall utilizing an item of 75 x 15mm hardwood with cupboard magnets on the opposite for ease of removal. After that merely tiled the wood using liquid nails as an adhesive, it was basic to do and leaves a little void for cleaning maker movement.The last task aside tidying up and telling everyone just how difficult you have had to function like I do, is to blank any kind of pre-drilled holes in the devices with the plastic spaces/ caps that feature the systems.Below are a choice of photos from a current brand-new kitchen area mount. They reveal before and also after, etc

    1. Cooking Area Devices Being Secure
    2. Kitchen area Completed.
    3. Kitchen area Prior to.
    4. All Set up and also Ended up.
    5. Pre-tiled.
    6. New Sockets and also Switch All Done.
    7. Allow there be light!
    8. Currently We’re Preparing!
    9. Fill Those Gaps.

    Final words.

    Thank you for reading this far. I wish you have found this guide useful and also now have enough self-confidence to tackle this task yourself. It can be tough at times, however it’s fulfilling when you stand back and also look at your beautiful new kitchen area.